
Wet Dress Rehearsal · Stennis Space Center, Mississippi
NET 2020-12-20 12:00 UTC
Engineers demonstrated loading, controlling and draining more than 700,000 gallons (2.6 million liters) of cryogenic propellants into the liquid oxygen and liquid hydrogen tanks and then returning the stage to a safe condition. Toward the end of the simulated terminal countdown, the test automatically stopped due to a valve closure being off by a fraction of a second. The team has corrected the timing, and additional analysis clears the way for hot fire.
Space Launch Now for iOS and Android
A notification before this event starts, the countdown on your home screen and watch, and the webcast when it starts.
NASASpaceflight ·
Space Launch System (SLS) Core Stage Green Run team members are working on new procedures to supply liquid oxygen (LOX) to the vehicle at lower temperatures in the next Wet Dress Rehearsal (WDR) attempt. The first attempt on December 7 at the Stennis Space Center in Mississippi was scrubbed because the temperature of the LOX was a few degrees higher than design requirements as it entered the vehicle; NASA did not want to continue loading with the temperature out of limits.
Arstechnica ·
"We're not going to have big issues that cause us to stand down."
SpaceNews ·
The latest in a series of delays in a test campaign for the core stage of the Space Launch System now leaves “very little margin” in the schedule for its launch next November, NASA managers said Dec. 10.